“The System Is Down”: How One IBM i Outage Was Resolved in an Afternoon

When temporary storage growth exhausted auxiliary storage on a furniture manufacturer's IBM i system, normal processing stopped, and the console became unreachable. Working together, a Briteskies RPG developer and IBM i system administrator regained access through the Hardware Management Console (HMC), performed a controlled shutdown and restart, and brought the business system back online in about two hours. 

At 1:30 on a Friday afternoon, a Briteskies RPG developer received a text no one wants to see: 
"The system is down. Can you help?" The client, a furniture manufacturer and distributor, had been working with Briteskies for more than a year, primarily for RPG development services. This situation, however, would require more than development expertise. 

The IBM i partition was still running, but the team could not establish a console session. Making matters more challenging, the client had reduced internal staffing while planning for future system changes and no longer had a dedicated IBM i system administrator on staff. 

“I logged on, and it looked like a hardware issue. I wasn’t sure, so I called for backup,” the developer said. Through the client's managed services relationship, he immediately brought in an IBM i system administrator. 

How Was IBM i Console Access Restored? 

The team set up a video call so everyone could follow along. Within about 10 minutes, they had created a virtual PC, set up a VPN, and guided an on-site employee to locate the Hardware Management Console (HMC) for the IBM Power server and confirm its IP address. 

The HMC had not been updated in years, and current web browsers could not connect to it. The administrator used an older version of Firefox to reach the HMC web interface, but the IBM i console session was still unavailable. 

With operations waiting, the team chose a controlled shutdown over an immediate one. It took more than 30 minutes, but it let active jobs and database activity end cleanly and buffered writes complete, reducing the risk of an abnormal shutdown and data integrity issues. 

After a manual restart and initial program load (IPL), console access returned within 15 minutes. 

Throughout the recovery effort, the administrator shared the screen with the client and explained each step, turning a stressful outage into a learning opportunity. 

What Caused the IBM i Outage? 

The outage was caused by temporary storage growth that consumed the remaining auxiliary storage on the IBM i system. A review of the IBM i history log showed that once the system reached its critical storage threshold, it could no longer continue normal processing. 

The IPL reclaimed the temporary storage and allowed operations to resume. Confirming the root cause also gave the client a clear starting point for reducing the risk of a repeat outage. 

Approximately two hours after the initial call, the client's business system was back online, before the outage could turn into a longer disruption to manufacturing and distribution. 

Why Was the IBM i Recovery More Difficult? 

The storage issue triggered the outage, but two other factors complicated the response: 

  • An outdated HMC environment 

  • The absence of an in-house IBM i administrator 

  • Neither caused the outage, but both slowed the recovery. 

An IBM i environment can run reliably for years while the people, tools, and processes surrounding it gradually change. Day-to-day operations may appear healthy until an unexpected event tests support readiness. 

The real question is not whether an outage will occur. The question is how prepared your organization is when one does.  

Is Your Team Ready for an IBM i Outage?

Consider these questions: 

  • If your team lost access to the system during an outage, how long would recovery take? 

  • If a storage issue stopped processing, what business activities would be affected? 

  • If specialized IBM i expertise were suddenly needed, who would provide it? 

  • Are your support tools and procedures current enough to help rather than hinder recovery? 

In this case, the client's managed services relationship provided immediate access to both RPG development and system administration expertise, which helped restore operations quickly and safely. 

The client later shared this feedback: “Thank you to Briteskies for the help that afternoon. We had an outage and were completely down. The team jumped on the issue with us, provided valuable expertise, and clearly explained what was happening along the way. We also learned from the experience. Thanks again for your help—it was truly appreciated.” 

How Briteskies Supports IBM i Environments 

Briteskies Managed Services provides access to experienced IBM i professionals who support daily operations, RPG development, system administration, troubleshooting, and unexpected issues like this one. 

When problems arise, having the right expertise available can make the difference between a prolonged outage and a controlled recovery. 

Need help recovering from an IBM i outage or strengthening your IBM i support readiness?

About Briteskies

Briteskies helps organizations support, secure, and modernize IBM i (AS/400) environments. We provide consulting, development, security audits, EDI solutions, and integration services based on each client’s systems and priorities. When teams need additional capacity, our staffing support works alongside their existing people to fill specialized skill gaps, address backlogs, and keep important initiatives moving while keeping the client’s team in the lead.

 